Inspection plans
Define inspection criteria by product, supplier, receipt, or quality scenario.
Inspection plans, quality holds, NCRs, approvals, control points, monitoring logs, and receiving rejections that can stop logistics before bad stock ships.

Define inspection criteria by product, supplier, receipt, or quality scenario.
Held lots are automatically excluded from outbound execution until released.
Create, investigate, assign, and track corrective action from a single NCR record.
Supervisor approval for release, override, or exceptional stock handling.
Capture CCP observations, hazard categories, and monitoring evidence over time.
Record line-clearance proof before allergen-sensitive changeovers or production restarts.
Document refused loads and quality rejection reasons at the dock instead of leaving them as oral exceptions.
Quality decisions propagate directly into warehouse execution instead of living in parallel notes
NCR, hold, and approval evidence stays attached to the lot and operation that triggered it
We walk receiving, traceability, quality, production, retail compliance, and warehouse execution using your real Sage 50 or multi-ERP scenario.